FCC Trustee Projects

This page serves as a one-stop list of all building- and facility-related projects at Friends Community Church. They will be separated by building with descriptions of scope and magnitude.

If you have any questions, if you finish a project, or if you notice something that needs to be added, please email travis@fccbrea.org.

Main building

Main Sanctuary

  • Sanctuary chairs need some cleaning/washing (and repairs if you know a guy)

  • Infant check-in desk; repair laminate gouge, add chair rail bumpers to cabinet face for strollers, wheelchairs and etc.

  • Repair water damage in men’s restroom ceiling, add kick down door stop to men’s door

  • Repair and/or replace emergency can light ballasts in all on main bldg

  • Replace bulbs or lamps in hallway lights (sm can Lts)

  • Clean/repair and or replace vinyl cove base throughout main bldg and sanc.

  • Add the rest of the metal corner guards on all corners of the building

Rest of Main building

  • Replace LED bulbs in all rooms and hallways

    • PRIORITY: Large classroom - it’s starting to get dark in there, so T8 bulb replacement is needed ASAP.

  • Replace lamps in main office hanging LTS. Estimate all new LED fixtures or retrofit bulbs

  • Clean/repair or replace vinyl cove base in all of second story rooms

  • Carpet replacement (quote on DEC 09)

315 Building

  • Main flex space

    • paint patching by stage

  • Front classrooms

    • Replace light bulbs in hanging and can lights

    • Repair Dutch door latch and add safety latch in pre-K classroom

  • Loft (upstairs attic)

    • Fix ducting

    • reorganize decorations

  • Exterior

    • New window decals needed for service times / RISE

307 Building

  • Warehouse

    • Inspect and fix open ceiling area near roll-up door (birds are getting into the building)

    • Re-insulate and repair paper on ceiling of basketball area (talk to Tim B. about this)

    • add shelving on wall between restroom & hallway door. This should be the same shelving that's in the women's & men's restrooms. Measurements for shelving size: 

      • Shelving size: 3ft 1in wide, 4ft tall

      • shelving should be "centered" with the following measurements : ~8in in from both door frames; 1ft 11 1/8in above top of baseboards; and 9 2/3in from top of door frames

      • Measurements of wall: 4ft 5in (width between door frames) & 6ft 9 5/8in (height from top of door frame to top of baseboards). 

      • Elmer says he has the shelving. Talk to him first.

    • Re-do floor (contact Allie before doing this at allie@fccbrea.org)

    • Stretch net across ceiling (to block balls from hitting lights; contact Allie before doing this at allie@fccbrea.org)

    • Finish painting paneling & walls (talk to Tim B.)

    • Hang up fire extinguisher box

    • Replace or fix LED fixtures that are out

    • Warehouse bathroom

      • Fix toilet paper dispenser

      • Replace lightbulb (and maybe look into LED fixture replacement solutions)

      • Add doorstop to bathroom door

    • Move fire extinguisher box (talk to Allie D. before permanently placing it).

  • Classrooms

    • Change flickering LED light strips

    • Paint scuffs

    • Repair holes in wall from doorknobs

      • Install floor-level doorstops

  • Front foyer

    • Remove signage for the ministries (you can keep the mounts on)

301 Building

  • Priority

    • Trade out hanging fluorescent fixtures for LED fixtures (talk to Tim B.)

    • Install stall door doorstops

  • repair ceiling paper in main room (water leak damage)

  • Add metal corner guards

  • Request upgrade from 5gal to 10gal H2O heater for kitchen (done?)